HVAC PACKAGES

BlueDiamond® Solution for Architects, Specifiers and Contractors

HVAC INSTALLATION MADE EASY, ALL-IN-ONE PACKAGE DESIGNED FOR YOUR CONVENIENCE

Simplifying the specification and installation process, our all-in-one HVAC package brings together all the essential components required for a complete air conditioning setup — including the pump, tubing, fixings, mounts, and hose clips — in a single, coordinated solution. Designed to support architects, specifiers, and contractors alike, this pre-packaged approach reduces sourcing time, ensures component compatibility, and promotes efficient, compliant installation across a wide range of projects.

why HVAC PACKAGES ARE important

Streamlined procurement: Specifying a complete HVAC package reduces the need to source and validate multiple individual components. This supports smoother project coordination, reduces administrative workload, and helps maintain clarity across disciplines.

Eliminate compatibility issues: Packages are typically designed with pre-selected components that are fully compatible, ensuring system coherence and reducing the likelihood of performance issues or rework due to mismatched parts.

Improve job efficiency: Providing contractors with a single, consolidated set of components helps streamline installation, reducing on-site delays and the risk of missing or incorrect items — critical for keeping projects on schedule.

Compliance and quality: Pre-packaged solutions often include components that meet relevant performance and regulatory standards, giving specifiers confidence in meeting compliance requirements and reducing time spent checking certifications.

Common challenges for ARCHITECTS & SPECIFIERS

Coordinating across multiple disciplines: Coordinating HVAC requirements with structural, electrical, and mechanical elements can complicate project workflows.

Compliance: When components are sourced individually, there is an increased risk of incompatibility and performance issues. On top of that keeping pace with changing regulations and ensuring all components meet relevant standards can be time-consuming.

Project management and delivery: Changes made late in the design or procurement stages often lead to delays and coordination issues. If you projects have tight deadlines and limited time for detailed procurement, sourcing each HVAC component individually can slow down project delivery.

OUR MOST EFFECTIVE solution

MAXIBLUE PRO

Max Flow: 14 L/MIN (3.7 G/HOUR)
Max Head: 8 M (23 FT)
Max Lift: 8 M (16.5FT)
Noise: 21 dB(A)
Unit: 8.0 – 14 KW (48000 BTU)

Available in UK & EU

Scroll to Top